Schneider Electric · MPPT 80
The battery equalization cycle has not started even though it was enabled. The charge controller requires completion of a bulk or absorption charging phase before equalization can begin.
Click steps to track your progress.
Allow the charge controller to complete its current charging cycle (bulk/absorption).
Check the status of the equalization cycle in InsightLocal.
Refer to the 'Equalizing Batteries' section for detailed information.
Verify that the battery type and settings support equalization.