The expected amplitude of 10 to 20 V DC is not detected between outdoor terminal block S2 and S3. This measurement is used to confirm the serial signal.
Klicken Sie auf Schritte, um Ihren Fortschritt zu verfolgen.
Ensure the bridge between outdoor terminal block S2 and S3 is correctly placed (if applicable for testing).
Turn off the power supply before checking connections.
If the voltage is not present, replace the inverter P.C. board.
Verify connections and wiring integrity.